Line 6, Guangzhou Metro
Guangzhou Metro Line 6
广州地铁6号线
|
Overview |
Type |
Rapid transit |
System |
Guangzhou Metro |
Status |
Under construction |
Termini |
Xunfenggang
Changban |
Stations |
22 |
Services |
1 |
Operation |
Owner |
City of Guangzhou |
Operator(s) |
Guangzhou Metro Corporation |
Technical |
Line length |
24.3 km (15.1 mi) |
Track gauge |
1,435 mm (4 ft 8 1⁄2 in) |
Electrification |
Third rails, 1,500 V DC |
Route map |
Legend
|
|
Luogang Depot |
|
|
|
|
|
Xiangxue |
|
|
Luogang |
|
|
Xiangang |
|
|
Science City East |
|
|
Xiangshan Lu |
|
|
Huangbei |
|
|
Gaotangshi |
|
|
Kemulang |
|
|
Longdong |
|
|
South China Botanical Garden |
|
|
Changban |
|
|
Tianhe Coach Terminal (transfer to Line 3 to open by 2013) |
|
|
|
Panyu Square |
|
|
Yantang (transfer to Line 3 to open by 2013) |
|
|
|
Airport South – Tiyu Xilu |
|
|
Tianpingjia |
|
|
Shahe |
|
|
Shaheding |
|
|
Huanghuagang |
|
|
Ouzhuang (transfer to Line 5 to open by 2013) |
|
|
|
Jiaokou – Wenchong |
|
|
|
Xilang – GZ East Railway Station |
|
|
Dongshankou (transfer to Line 1 to open by 2013) |
|
|
Donghu |
|
|
Yuexiunan |
|
|
Beijing Lu |
|
|
Haizhu Square (transfer to Line 2 to open by 2013) |
|
|
|
Jiahewanggang – GZ South Railway Station |
|
|
Yide Lu |
|
|
Culture Park (transfer to Line 8 to open by 2013) |
|
|
|
Wanshengwei |
|
|
Huangsha (transfer to Line 1) |
|
|
|
GZ East Railway Station – Xilang |
|
|
Ruyifang |
|
|
|
Shabeihai River |
|
|
|
Guangmao Railway |
|
|
Tanwei (transfer to Line 5 to open by 2013) |
|
|
|
Wenchong – Jiaokou |
|
|
Connecting line towards Line 5 |
|
|
Hesha |
|
|
|
|
|
|
Baisha River |
|
|
Shabei |
|
|
Hengsha |
|
|
|
Beihuan Expressway |
|
|
Xunfenggang |
|
|
|
|
|
|
Wuguang Passenger Railway |
|
|
|
|
|
Xunfenggang Stabling Yard |
|
|
Line 6 of the Guangzhou Metro (Chinese: 广州地铁6号线; pinyin: Guǎngzhōu Dìtiě Liù Hào Xiàn) or Luogang Line (Chinese: 萝岗线; pinyin: Luógǎng Xiàn) runs from Liwan District to Tianhe District later toward Luogang District. It starts at Xunfenggang and ends at Changban, interchanging with Line 5 at Tanwei, Line 1 at Huangsha, Line 8 at Cultural Park, Line 2 at Haizhu Square, Line 1 at Dongshankou, Line 5 at Ouzhuang, Line 3 at Yantang and Line 3 at Tianhe Coach Terminal Station. The total length is 24.3 km with 22 stations. Line 6's color is Purple. The Line 6 section between Xunfenggang and Changban is expected to be operational from 2012.
Luogang Line Stations
Station Code |
Station Name |
Chinese |
Platform Type |
Transfers |
Area |
Luogang Line (萝岗线) |
L6/01 |
Xunfenggang |
浔峰岗 |
(Phase I) |
|
— |
L6/02 |
Hengsha |
横沙 |
|
L6/03 |
Shabei |
沙贝 |
|
L6/04 |
Hesha |
河沙 |
|
L6/05 |
Tanwei |
坦尾 |
Line 5 |
L6/06 |
Ruyifang |
如意坊 |
Line 11 |
L6/07 |
Huangsha |
黄沙 |
Line 1 |
L6/08 |
Cultural Park |
文化公园 |
Line 8 |
L6/09 |
Yide Lu |
一德路 |
|
L6/10 |
Haizhu Square |
海珠广场 |
Line 2 |
L6/11 |
Beijing Lu |
北京路 |
|
L6/12 |
Yuexiunan |
越秀南 |
|
L6/13 |
Donghu |
东湖 |
|
L6/14 |
Dongshankou |
东山口 |
Line 1 |
L6/15 |
Ouzhuang |
区庄 |
Line 5 |
L6/16 |
Huanghuagang |
黄花岗 |
|
L6/17 |
Shaheding |
沙河顶 |
|
L6/18 |
Shahe |
沙河 |
Line 11 |
L6/19 |
Tianpingjia |
天平架 |
|
L6/20 |
Yantang |
燕塘 |
Line 3 |
L6/21 |
Tianhe Coach Terminal |
天河客运站 |
Line 3 |
L6/22 |
Changban |
长湴 |
|
L6/23 |
Botanical Garden |
植物园 |
(Phase II) |
|
— |
L6/24 |
Longdong |
龙洞 |
|
L6/25 |
Kemulang |
柯木塱 |
|
L6/26 |
Gaotangshi |
高塘石 |
|
L6/27 |
Huangbei |
黄陂 |
|
L6/28 |
Xiangshan Lu |
香山路 |
|
L6/29 |
Science City East |
科学城东 |
Line 4 |
L6/30 |
Xiangang |
暹岗 |
|
L6/31 |
Luogang |
萝岗 |
|
L6/32 |
Xiangxue |
香雪 |
|
References
|
|
In operation |
|
|
Under construction |
|
|
Construction
to start by 2015 |
|
|
Construction
to start by 2020 |
|
|
Construction
to start by 2040 |
|
9 (Fei'eling–Forest Park) • 14 (Yangshenggu–Liangkou) • 15 (Xiaonansha Island–Nansha Ferry Pier loop line) • 17 (Zini–Lianhua Mountain) • 18 (Shiqiao–Lianhua Mountain) • 19 (Suiyan Lu–Cencun)
|
|
|
|
|
Note: Facilities that are either under construction, under planning or pending for approval are shown in italic.
|
|
Guangdong, China |
|
|
Hong Kong |
|
|
|
|
505 · 507 · 610 · 614 · 614P · 615 · 615P · 705 · 706 · 751 · 751P · 761P
|
|
Trams and Cable Car
|
|
|
|
Macau |
|
|
Inter-city lines |
PRD Rapid Transit lines
|
|
|
Other lines
|
|
|
|
Automated people mover systems |
|
|
Major terminals |
Rail transport
|
|
|
Airports
|
|
|
Ports
|
|
|
|
Ferry services |
|
|
|
|